Common Description
Equipped with the zero leak bidirectional checking sole-noid valves, this energy unit is designed for the operation of two independent circuits. Which are respectively for your major and subordinate platforms of the double scissors lift. Two cut-off valves are utilized for lowering the machine manually in situation of power reduction. If additional independent circuits are needed to your application please get in touch with us for availability.
Remark: one. Please consult our product sales engineer for the various pump displacement, motor power or tank capability.
2. CSA or UL licensed motors are available on request.
Specific Notes
one. The AC motor is of S3 duty cycle, which could only work intermittently and repeatedly, i.e., 1minute on and 9 minutes off.
2. Clean the many hydraulic elements concerned ahead of installation of the power unit.
three. Viscosity with the oil shoud be 15~46 cst,as well as the oil really should be clean and absolutely free of impurities,N46 hydraulic oil is proposed.
four. The energy unit need to be mounted vertically.
five. Check the oil degree while in the tank after the initial operating of your power unit.
6. Oil modifying is needed soon after the preliminary a hundred operation hours,afterwards once every single 3000 hours.